Scheduled maintenance on the MSK-3 power supply network from 27-10-26 14:00 MSK to 27-10-26 16:00 MSK

Scheduled maintenance Bare Metal Pools MSK-3
27-10-26 14:00 MSK · 2 hours

Updates

Scheduled

On October 27, 2026, between 14:00 and 16:00, scheduled monthly testing of Dynamic Uninterruptible Power Supply No. 5 (DUPS No. 5) will be carried out at MSK-3. This system provides uninterrupted power to Feed No. 1 in Server Room No. 7 (including power distribution units/PDUs labeled “Feed No. 1,” “ЩБП 7.1, Feed No. 1,” etc.).

The test will include checking the diesel generator set (DGS) that forms part of DUPS No. 5.

The server room’s second power feed will continue to operate normally from a separate DUPS. Testing of DUPS No. 5 is not expected to interrupt power to the server room.

No equipment shutdowns are planned during the work.