Scheduled maintenance on the electrical equipment at the MSK-5 data center from 08-10-26 09:00 MSK to 08-10-26 20:00 MSK
Scheduled maintenance
Bare Metal
Pools
MSK-5
08-10-26 09:00 MSK
· 11 hours
Updates
Scheduled
September 25, 2026 · 16:29 MSK
On October 8, 2026, from 09:00 to 20:00 (UTC+3), maintenance work is scheduled for the diesel generator set at the MSK-5 facility located at 33G Altufyevskoye Highway, Moscow.
During the work, the level of power redundancy on one power feed is expected to be reduced. Server shutdowns are not planned, and the servers will continue operating normally.
We apologize for any inconvenience this may cause.