Planned upgrade of access routers in MSK-3 from 23-04-26 23:00 MSK to 24-04-26 06:00 MSK

Scheduled maintenance Bare Metal Pools MSK-3 VMware Cloud Pools AVM1 | SILVER-1 AVM1 | GOLD-1 AVM1 + BRZ2 | PLATINUM-1
23-04-26 23:00 MSK · 7 hours

Updates

Scheduled

It is planned to carry out routine maintenance with 23.04.2025 23:00 - 24.04.2025 06:00 ( GMT+3), to upgrade network equipment that provides Internet access to clients of dedicated servers / colocation / the Vmware cloud at the MSK-3 location.

Expected impact:

Reducing the redundancy level of routers for the entire operation time to N+0, for shared subnets and for dedicated subnets with vrrp enabled.
Reducing the level of router redundancy for the entire period to N+0, for clients of the VMware-based Cloud service.
There will be 2 breaks, up to 30 seconds each. Across all types of networks.
Configuration in the control panel will not be available at this time.
We apologize for any inconvenience.

April 16, 2026 · 16:55 MSK

← Back