Scheduled maintenance work on electrical equipment at the SPB-2 from 19-11-25 10:00 MSK to 19-11-25 13:00 MSK

Scheduled maintenance Bare Metal Pools SPB-2 Cloud Platform Pools ru-3a ru-3b ru-3c
19-11-25 10:00 MSK · 3 hours

Updates

Scheduled

We would like to inform you that on November 19, 2025, between 10:00-13:00 (UTC+3), the Tsvetochnaya-2 data center will conduct tests of the automatic transfer switch system, simulating a power outage at two inputs and transferring the load to the diesel generator. No equipment shutdowns are expected in the server racks.

November 13, 2025 · 07:48 MSK