Updating L2VPN access routers in SPB-5 from 02-10-25 22:00 MSK to 02-10-25 23:59 MSK
Scheduled maintenance
Bare Metal
Pools
SPB-5
02-10-25 22:00 MSK
· 1 hour, 59 minutes
Updates
Scheduled
September 29, 2025 · 18:09 MSK
Scheduled maintenance is planned to upgrade the network equipment serving L2VPN dedicated servers/colocation at the SPB-5 location.
Expected impact:
Reduction in the level of redundancy for L2VPN services to N+0 for the duration of the work.
No downtime is expected.
← Back