Scheduled maintenance of power supply devices in the racks of the Berzarin DC 08/25/2025 - 08/26/2025 from 2025-08-25 23:00 to 2025-08-26 07:00 from 25-08-25 23:00 MSK to 26-08-25 07:00 MSK
Scheduled maintenance
VMware Cloud
Pools
AVM1 + BRZ2 | PLATINUM-1
25-08-25 23:00 MSK
· 8 hours
Updates
Scheduled
August 21, 2025 · 12:47 MSK
In the Berzarina DC, from 23:00 on 25.08.2025 to 07:00 on 26.08.2025 Moscow time, scheduled maintenance of power supply devices in racks where VMware hosts are located will be carried out, aimed at improving the quality of the service provided. During scheduled maintenance on electrical equipment in the rack, power redundancy will be reduced, downtime is not expected.