Planned work on upgrading network equipment in SPB-3 from 14-05-25 23:00 MSK to 15-05-25 04:00 MSK

Scheduled maintenance Bare Metal Pools SPB-3 Services Network
14-05-25 23:00 MSK · 5 hours

Updates

Scheduled

In order to improve the quality of our services, scheduled infrastructure modernization activities will be carried out from 05/14/2025 23:00 to 05/15/2025 04:00 Moscow time. During the work period, it is planned to reduce the redundancy level of local network switches for the entire duration of work, as well as a break in the local network to 1 minute in the specified time interval.

If your resources fall under the specified works, then you will receive a notification within the control panel my.selectel.ru

We apologize for any inconvenience.

May 6, 2025 · 20:02 MSK

← Back