Planned shutdown of the first power supply input in Dubrovka-1 from 24-03-25 09:00 MSK to 18-04-25 10:00 MSK

Scheduled maintenance Bare Metal Pools SPB-4 Services Dedicated Servers Colocation
24-03-25 09:00 MSK · 3 weeks, 4 days, 1 hour

Updates

Scheduled

In order to improve the quality of our services, scheduled electrical equipment upgrade works will be carried out in the Dubrovka-1 data center from 24.03.2025 to 18.04.2025.

During the work, one power supply input will be disconnected.

Expected impact:

  • reduction in the level of power supply redundancy in server racks.

The operation of servers with one power supply unit will not be affected by these operations.
If the server has two power supplies, one of them will be disconnected, but the equipment will continue to operate.

March 20, 2025 · 12:41 MSK

← Back