Emergency work to reconfigure the BGP interface from 24-01-25 12:00 MSK to 24-01-25 16:00 MSK
Scheduled maintenance
Bare Metal
Pools
TAS-1
Services
Network
Cloud Platform
Services
Network
Data centers
Tashkent
Unicon
Infrastructure
Network
24-01-25 12:00 MSK
· 4 hours
Updates
Update
January 24, 2025 · 16:19 MSK
The work was cancelled.
The new date and time will be indicated in the next notification update in the status panel.
Scheduled
January 24, 2025 · 13:00 MSK
In connection with the regulator’s requirement, urgent works on reconfiguration of the junction with Uzbek peering will be carried out on January 24, 2025.
As part of these works, BGP session reconfiguration through the intermediate operator TAS-IX will be performed.
Work period: from 24.01.2025 12:00 to 24.01.2025 16:00 UTC+3.
Expected consequences:
- Temporary deterioration of connectivity between network participants in Uzbekistan and lack of access to Sharq Telecom operator;
- access to the World Wide Web will continue to function normally.
We apologize for possible inconvenience.