Scheduled Maintenance on Electrical Equipment at Data Center "Tsvetochnaya-2" from 14-11-24 10:00 MSK to 14-11-24 13:00 MSK

Scheduled maintenance Bare Metal Pools SPB-2 Services Dedicated Servers Colocation Racks Data centers St.Petersburg Tsvetochnaya-2 Infrastructure Electricity
14-11-24 10:00 MSK · 3 hours

Updates

Scheduled

We would like to inform you that on November 14 from 10:00 to 13:00 Moscow time, scheduled maintenance will take place at the “Tsvetochnaya-2” data center. The work will involve testing the Automatic Transfer Switch (ATS) system by simulating a power outage from the main grid, with load transfer to diesel generator power.

During ATS activation, the power supply for server room equipment will be provided by the UPS system for the respective cluster. No server equipment shutdowns are planned.

If this work affects your equipment, you will receive a notification through the Notification Center in the Control Panel.

We apologize for any inconvenience this may cause.

November 11, 2024 · 10:05 MSK