Planned work to improve stability of the control panel for dedicated servers. from 03-10-24 23:00 MSK to 04-10-24 01:00 MSK

Scheduled maintenance Bare Metal Pools SPB-1 SPB-2 SPB-3 SPB-4 SPB-5 MSK-1 MSK-2 MSK-3 NSK-1 TAS-1 NBO-1 ALM-1 Services Dedicated Servers Interfaces API Control Panel
03-10-24 23:00 MSK · 2 hours

Updates

Scheduled

On 03.10.2024 from 23:00 to 04.10.2024 01:00 (UTC +3) scheduled work will be carried out to improve the stability of the control panel for dedicated servers.

During the work, it is expected that the control layer of the equipment via the Control Panel and API program interface will be unavailable for up to 60 minutes.

The availability of the equipment will not be affected.

September 19, 2024 · 22:59 MSK

← Back