Planned work on the VMware public cloud infrastructure in the regions: SPB and MSK from 06-08-24 00:00 MSK to 06-08-24 04:00 MSK
Scheduled maintenance
VMware Cloud
Pools
AVM1 | SILVER-1
AVM1 | GOLD-1
AVM1 + BRZ2 | PLATINUM-1
DUB3 | SILVER-1
DUB3 | GOLD-1
DUB3 + CVT2 | GOLD-1
Private Cloud
Services
Virtual Data Centers
VMware clusters
vCloud Director
Cloud powered by VMware backup
Backup SPB
Backup MSK
Backup Console SPB
Backup Console MSK
06-08-24 00:00 MSK
· 4 hours
Updates
Scheduled
July 26, 2024 · 08:23 MSK
We inform you about the planned work to replace SSL certificates on the VMware cloud infrastructure in the MSK and SPB regions.
The work will be carried out on 08/06/2024 in the period from 00:00 to 04:00 (MSK). During the specified period of time, there will be a short-term unavailability of the VMware Cloud Director control panel, the Self-Service Backup Portal control panel, backup and recovery operations will be unavailable, and replication of VMware Cloud Availability will be suspended.
The performance of cloud networks and virtual machines will not be affected.
We apologize for any inconvenience.